20160824_175928 Published on November 9, 2016 in History, Construction & ReconstructionFull resolution (5312 × 2976) ← Previous Next → The pull-out extension, mid re-build. The frame has cleaned up and painted, and re-framing and insulation is underway The metal-framed pull-out section of the lounge midway through restoration. Like this:Like Loading...